| # Boulder Release Process | |
| A description and demonstration of the full process for tagging a normal weekly | |
| release and a hotfix release. | |
| Once a release is tagged, it will be generally deployed to | |
| [staging](https://letsencrypt.org/docs/staging-environment/) and then to | |
| [production](https://acme-v02.api.letsencrypt.org/) over the next few days. | |
| ## Goals | |
| 1. All development, including reverts and hotfixes needed to patch a broken | |
| release, happens on the `main` branch of this repository. Code is never | |
| deployed without being reviewed and merged here first, and code is never | |
| landed on a release branch that isn't landed on `main` first. | |
| 2. Doing a normal release requires approximately zero thought. It Just Works. | |
| 3. Doing a hotfix release differs as little as possible from the normal release | |
| process. | |
| ## Release Schedule | |
| Boulder developers make a new release at the beginning of each week, typically | |
| around 10am PST **Monday**. Operations deploys the new release to the [staging | |
| environment](https://letsencrypt.org/docs/staging-environment/) on **Tuesday**, | |
| typically by 2pm PST. If there have been no issues discovered with the release | |
| from its time in staging, then on **Thursday** the operations team deploys the | |
| release to the production environment. | |
| Holidays, unexpected bugs, and other resource constraints may affect the above | |
| schedule and result in staging or production updates being skipped. It should be | |
| considered a guideline for normal releases but not a strict contract. | |
| ## Release Structure | |
| As of 2025-06-30, releases are tagged with a tag of the form `v0.YYYYMMDD.N`, where | |
| the `YYYYMMDD` is the date that the initial release is cut (usually the Monday | |
| of the current week), and `N` is an integer indicating the hotfix number, | |
| starting at `0`. For example, a regular release might be `v0.20250707.0`, and | |
| the first hotfix for that release would be `v0.20250707.1`. | |
| Historically, releases were tagged with the form `release-YYYY-MM-DD[x]`, where | |
| `[x]` was an optional lowercase letter suffix for hotfixes. For example, the | |
| second hotfix release (i.e. third release overall) in the third week of | |
| January 2022 was [`release-2022-01-18b`](https://github.com/letsencrypt/boulder/releases/tag/release-2022-01-18b). | |
| All release tags are signed with a key associated with a Boulder developer. Tag | |
| signatures are automatically verified by GitHub using the public keys that | |
| developer has uploaded, and are additionally checked before being built and | |
| deployed to our staging and production environments. Note that, due to how Git | |
| works, in order for a tag to be signed it must also have a message; we set the | |
| tag message to just be a slightly more readable version of the tag name. | |
| ## Making a Release | |
| ### Prerequisites | |
| * You must have a GPG key with signing capability: | |
| * [Checking for existing GPG keys](https://docs.github.com/en/free-pro-team@latest/github/authenticating-to-github/checking-for-existing-gpg-keys) | |
| * If you don't have a GPG key with signing capability, create one: | |
| * [Generating a new local GPG key](https://docs.github.com/en/free-pro-team@latest/github/authenticating-to-github/generating-a-new-gpg-key) | |
| * [Generating a new Yubikey GPG key](https://support.yubico.com/hc/en-us/articles/360013790259-Using-Your-YubiKey-with-OpenPGP) | |
| * The signing GPG key must be added to your GitHub account: | |
| * [Adding a new GPG key to your GitHub | |
| account](https://docs.github.com/en/free-pro-team@latest/github/authenticating-to-github/adding-a-new-gpg-key-to-your-github-account) | |
| * `git` *may* need to be configured to call the correct GPG binary: | |
| * The default: `git config --global gpg.program gpg` is correct for most Linux platforms | |
| * On macOS and some Linux platforms: `git config --global gpg.program gpg2` is correct | |
| * `git` must be configured to use the correct GPG key: | |
| * [Telling Git about your GPG key](https://docs.github.com/en/free-pro-team@latest/github/authenticating-to-github/telling-git-about-your-signing-key) | |
| * Understand the [process for signing tags](https://docs.github.com/en/free-pro-team@latest/github/authenticating-to-github/signing-tags) | |
| ### Regular Releases | |
| Simply create a signed tag. The `tools/release/tag` tool will automatically | |
| determine the correct tag name based on the current date. | |
| ```sh | |
| go run github.com/letsencrypt/boulder/tools/release/tag@main | |
| ``` | |
| This will print the newly-created tag and instructions on how to push it after | |
| you are satisfied that it is correct. Alternately you can run the command with | |
| the `-push` flag to push the resulting tag automatically. | |
| ### Hotfix Releases | |
| Sometimes it is necessary to create a new release which looks like a prior | |
| release but with one or more additional commits added. This is usually the case | |
| when we discover a critical bug in the currently-deployed version that needs to | |
| be fixed, but we don't want to include other changes that have already been | |
| merged to `main` since the currently-deployed release was tagged. | |
| In this situation, we create a new hotfix release branch starting at the point | |
| of the previous release tag. We then use the normal GitHub PR and code-review | |
| process to copy the necessary fix(es) from `main` (where they must already be | |
| merged) to the release branch. Finally we create a new release tag at the tip | |
| of the release branch instead of the tip of main. | |
| To create the new release branch, substitute the name of the release tag which you want to use as the starting point into this command: | |
| ```sh | |
| go run github.com/letsencrypt/boulder/tools/release/branch@main v0.YYYYMMDD.0 | |
| ``` | |
| This will create a release branch named `release-branch-v0.YYYYMMDD`. When all necessary PRs have been merged into that branch, create the new tag by substituting the branch name into this command: | |
| ```sh | |
| go run github.com/letsencrypt/boulder/tools/release/tag@main release-branch-v0.YYYYMMDD | |
| ``` | |
| ## Deploying Releases | |
| When doing a release, SRE's tooling will check that: | |
| 1. GitHub shows that tests have passed for the commit at the planned release | |
| tag. | |
| 2. The planned release tag is an ancestor of the current `main` on GitHub, or | |
| the planned release tag is equal to the head of a branch named | |
| `release-branch-XXX`, and all commits between `main` and the head of that | |
| branch are cherry-picks of commits which landed on `main` following the | |
| normal review process. | |
| These checks ensure that all deployed code has been properly reviewed and tested before reaching production environments. |